Turn-key project for Maire Engineering

In 2008 DOKO was engaged to realize the construction of 20 kV as subcontractor of Maire Engineering for: topography service, geological studies, civil work/ foundation, supply/installation, tower erection, conductor stringing, OPGW stringing, test and commissioning.