In 2014 DOKO was contracted as subcontractor of EnergoInvest for the construction of 110kV transmission line Babice – Sarande project. This was a project for experts in which DOKO showed why we own this reputation since we finished 100 % of works for which we was contracted respecting time limits even if the area we worked has been one of most hard because of rocks for which we have used controlled explosions for civil works, and we have used drone for conductor stringing. In this project we did: topography service, geological studies, civil work/ foundation, supply / installation, tower erection, conductor stringing, OPGW stringing, testing and commissioning.
0
Date of project
0
kV
Project
Turn-key project for EnergoInvest